Gulfstream Twin Commander 680F


Plane Diagram

Gulfstream Twin Commander 680F

FAA requires both sides of the aircraft to be installed at the same time. Sets only sold in pairs for this aircraft.


FAA STC/PMA Approved De-icers
  Qty UTC/BFG P/N Location  
1 SMR2015-12-1 Nac-Brk LH
1 SMR2015-13-1 Nac-Brk LH
1 SMR2015-12-2 Nac-Brk RH
1 SMR2015-7-1 Vertical Fin
1 SMR2015-3-1 Horz Stab LH
1 SMR2015-3-2 Horz Stab RH



Documentation

STC/AML Documentation

SA02005NY

Aircraft Flight Manual Supplement

Airplane Flight Manual Supplements

Wing Boot

  • 48 hour delivery for Standard Boots and 72 hour delivery for PSA boots in the Continental US and ground shipments to Canada.
  • Laboratory proven to last 3 to 5 times longer than competitor's tube type design.
  • Same footprint so there are no exposed areas needing backfill or painting.
Aircraft Gulfstream Twin Commander 680F
Classification Wing Boot
Full Description
BF Goodrich P/N:
Safeway P/N:
Rapco P/N:
Airframe P/N: